基于SEM的BIM技术对施工项目管理的影响研究
CSTR:
作者:
作者单位:

苏州科技大学土木工程学院,江苏苏州 215000

作者简介:

王煜庭(1999一),男,硕士研究生,从事智能建造研究。

通讯作者:

中图分类号:

TU71

基金项目:

国家自然科学基金资助项目(72201188);苏州市科技计划(基础研究)资助项目(SJC2023002)


Impact study of BIM technology based on SEM on construction project management
Author:
Affiliation:

School of Civil Engineering,Suzhou University of Science and Technology,Suzhou 215000 ,Jiangsu,China

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    BIM技术正逐步应用于施工企业项目管理,但不同施工项目应用状况不同,对项目管理的影响也不同。为了解BIM技术对不同施工项目管理领域影响大小,提出BIM技术在部分领域影响不足、应用效果不显著问题的解决方法,通过建立结构方程模型,调查并分析了BIM技术对施工项目管理的影响。结果表明:1)BIM技术对施工企业的进度管理和成本管理有正向影响,对质量管理有轻微的正向影响,其他方面正向影响不明显。在进度管理中,BIM技术的使用可以加快施工进度计划的编制并使计划更符合实际;2)在成本管理中,BIM技术可以在设计阶段准确地预测成本,在竣工验收阶段精确统计成本,减少人力成本;3)在质量管理中,可以提前进行碰撞检查。本文研究成果可为施工企业全面评估和优化BIM技术在项目管理中的应用提供重要参考。

    Abstract:

    BIM technology is gradually being applied to project management in construction enterprises, but the application conditions of different construction projects are different, and the impact on project management is also different. In order to understand the impact of BIM technology on different construction project management fields, a solution to the problem that BIM technology has insufficient influence and insignificant application effect in some fields is proposed, the impact of BIM technology on construction project management is investigated and analyzed by establishing a structural equation model. The results show that BIM technology has a positive impact on the schedule management and cost management of construction enterprises, has a slight positive impact on quality management, and has an inconspicuously positive impact on other aspects. In schedule management, the use of BIM technology can speed up the preparation of construction schedules and make plans more realistic; In cost management, BIM technology can accurately predict costs in the design stage, accurately count costs in the completion and acceptance stages, and reduce labor costs. In quality management, collision checks can be carried out in advance. The results can provide an important reference for construction enterprises to comprehensively evaluate and optimize the application of BIM technology in project management.

    参考文献
    相似文献
    引证文献
引用本文

王煜庭,祝连波,伍平安,虞芷绮.基于SEM的BIM技术对施工项目管理的影响研究[J].工程建设,2025,57(2):68-75

复制
分享
相关视频

文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2024-04-06
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2025-11-27
  • 出版日期:
文章二维码