电缆管涵整体原位保护的设计与施工技术
CSTR:
作者:
作者单位:

1.广东省建筑科学研究院集团股份有限公司,广东广州 510500 ;2.上海市建设工程安全质量监督总站,上海 200032 ;3.上海隧道工程有限公司,上海 200032

作者简介:

郑坚耀(1995—),男,工程师,从事工程项目管理工作。

通讯作者:

中图分类号:

TU990.3

基金项目:

上海隧道工程有限公司科研项目“南京复杂地层深基坑施工关键技术研究”(2018-SK-15)


Design and construction technology of overall in-situ protection of cable pipe gallery
Author:
Affiliation:

1.Guangdong Provincial Academy of Building Research Group Co., Ltd., Guangzhou 510500 , Guangdong, China ;2.Shanghai Municipal Safety and Quality Supervision Administration for Construction Engineering, Shanghai 200032 , China ; 3.Shanghai Tunnel Engineering Co., Ltd., Shanghai 200032 , China

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    南京地铁5号线云南路站施工期间,对大尺寸 110kV 电缆管涵的保护至关重要。文章综合对比了工期、费用、风险后,决定优化车站结构尺寸和施工次序并对 110kV 电缆管涵作整体原位保护。保护设计方案采用型钢梁、柱(局部利用车站既有围护桩)结构,根据荷载及受力体系计算,确定型钢桩尺寸,并细化了梁柱节点连接方式;现场施工期间通过原位试验优化了型钢桩深度、在围护桩预埋弧形钢板确保与型钢牛腿有效连接、采取垫钢楔块和填充细石混凝土等措施有效减小电缆管涵的变形,精细化管理并加强现场巡视与监测。结果表明:在工程风险与环境风险可控条件下管线整体原位保护造价和工期具有优势,保护方案应结合车站设计方案和施工时序综合考虑,实施过程中可通过试验对方案进一步优化。

    Abstract:

    During the construction period of Yunnan road station on nanjing metro line 5, the protection of large-sized 110 kV cable pipe culverts is of vital importance. After a comprehensive comparison of the construction period, cost and risk, the article decided to optimize the structural dimensions and construction sequence of the station and carry out overall in-situ protection for the 110kV cable pipe culvert. The protection design scheme adopted the structure of steel beams and columns (partially utilizing the existing retaining piles of the station), and calculated based on the load and force system. Determine the size of the steel section piles. And the connection mode of beam-column joints is refined; During the on-site construction period, the depth of the steel section piles is optimized through in-situ tests. Arc-shaped steel plates are pre-embedded in the retaining piles to ensure effective connection with the steel section corbels. Measures such as padding steel wedges and filling with fine aggregate concrete are adopted to effectively reduce the deformation of cables, pipes and culverts. Refined management is carried out and on-site inspection and monitoring are strengthened. The results show that under the controllable conditions of engineering risks and environmental risks, the cost and construction period of the overall in-situ protection of pipelines have advantages. The protection plan should be comprehensively considered in combination with the station design plan and the construction sequence. During the implementation process, the plan can be further optimized through tests.

    参考文献
    相似文献
    引证文献
引用本文

郑坚耀,郑坚杰,沈岚.电缆管涵整体原位保护的设计与施工技术[J].工程建设,2025,57(6):66-74