黄河流域长距离调水工程预处理方案设计
CSTR:
作者:
作者单位:

作者简介:

王全锋(1984—),男,高级工程师,注册公用设备工程师(给水排水)、注册咨询工程师(投资),从事长距离调水工程设计

通讯作者:

中图分类号:

TV68

基金项目:

水利部先进实用技术示范项目(SF-202206)


Pretreatment scheme design of long-distance water diversion project in Yellow River basin
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    针对黄河水夏季高温高浊、冬季低温低浊的特殊水质特征,结合黄河流域生态补水工程实际需求,解决预处理段沉沙池适配性设计问题及实例。文章以岱海生态应急补水工程预处理方案设计为实例,对适用于黄河水季节性水质特点的沉沙池类型开展详细比选分析,基于取水口多年平均悬移质级配实测成果,进行数据整理与频率排列,据此合理确定沉沙池水力参数,完成方案优化设计;通过数值模拟方法计算汛期泥沙量,精细化分析池内淤积分布与淤积厚度变化规律,进而制定间歇清淤排沙方案。结果表明:通过池型比选、容积优化与淤积模拟的系统研究,形成了适配黄河水季节性水质特征的沉沙池设计方案,其容积既能兼顾非汛期生态补水水文沙特性,既保障了沉沙处理效率,又实现了后期运维管理的便捷性,为同类高滩高浊、低温高浊水源的生态补水工程预处理系统设计提供了可行参考。

    Abstract:

    In view of the special water quality characteristics of the Yellow River water with high temperature and high turbidity in summer and low temperature and high turbidity in winter, combined with the actual needs of the Daihai ecological emergency water supply project in the Yellow River basin, the adaptability design problem of the desilting tank in the pretreatment stage is solved, which provides technical support for the efficient operation of the project and the later operation and maintenance management, and ensures the quality of ecological water supply and the stability of the project. Taking the pretreatment scheme design of Daihai ecological emergency water replenishment project as an example, firstly, the detailed comparison and analysis of the desilting basin type suitable for the seasonal water quality characteristics of the Yellow River are carried out. Based on the measured results of the average suspended sediment particle size distribution at the intake for many years, the data are sorted out and the law is judged. Based on this, the core volume parameters of the sedimentation tank are reasonably determined, and the scheme optimization design is completed. The numerical simulation method is used to calculate the sediment deposition during the water intake period, and the distribution of the deposition position and the change rule of the deposition depth in the pool are accurately analyzed, and then the dredging arrangement scheme during the intermittent period is formulated. Through the systematic study of pool type selection, volume optimization and sedimentation simulation, a design scheme of desilting basin suitable for the seasonal water quality characteristic of the Yellow River is formed. The volume parameters and dredging arrangements fully combine the hydrological and sediment characteristics, which not only ensures the efficiency of desilting treatment, but also realizes the convenience of later operation and maintenance management. It provides a feasible reference for the design of ecological water supply project pretreatment system for similar high temperature and high turbidity, low temperature and high turbidity water sources.

    参考文献
    相似文献
    引证文献
引用本文

王全锋,李政伟,韩珊珊.黄河流域长距离调水工程预处理方案设计[J].工程建设,2026,58(3):42-47